Spain Public Procurement Contract Types Explained

Understand Works, Supplies, Services, Concessions and Mixed Contracts Under Spain’s Public Procurement Law

By Admin | Posted on 03 Nov 2026


Spain Public Procurement Contract Types : Complete Guide

Introduction

Spain’s public procurement market includes opportunities for construction companies, manufacturers, equipment suppliers, IT businesses, consultants, maintenance providers, transport operators and many other service providers. However, not every public tender is structured in the same way. The legal classification of a contract determines the nature of the procurement, the obligations of the successful bidder and several important aspects of the tendering process.

Under Spain’s Public Sector Contracts Law, Ley 9/2017, de Contratos del Sector Público (LCSP), public-sector contracts are classified into five principal categories: works contracts, works concessions, services concessions, supply contracts and services contracts. The law also recognises mixed contracts, which combine elements of different contract types when the statutory conditions are satisfied.

Understanding these classifications is essential for businesses that want to participate in Spanish government tenders. A construction project, an IT equipment purchase, a software development assignment and the operation of a public facility may all be advertised by public authorities, but they have different contractual structures and supplier requirements.

This guide explains each contract type, its legal characteristics, typical procurement examples and its practical impact on suppliers. It also explains mixed contracts, concession risk, contract classification and how businesses can use contract type when searching for opportunities in Spain.

Table of Contents

Understanding Public Procurement Contract Types in Spain

Contract classification identifies the principal subject of a public procurement agreement. It helps establish whether the authority is purchasing a completed construction project, acquiring goods, commissioning a service or transferring the right to exploit infrastructure or a public service in exchange for consideration.

Article 12 of the LCSP identifies the main contractual categories and provides that contracts must be classified according to the rules in the law. Articles 13 to 18 define the principal types and the conditions applicable to mixed contracts.

The five principal categories are:

  • Works contracts: Execution of construction or engineering works, including certain activities listed in Annex I of the LCSP.
  • Works concessions: Execution or design and execution of works where the contractor receives the right to exploit the completed works, potentially together with a price, and assumes operational risk.
  • Services concessions: Management or provision of a public service where the concessionaire receives the right to exploit the service, potentially together with a price, and assumes operational risk.
  • Supply contracts: Acquisition or rental of movable goods and certain equipment, products and software-related arrangements covered by the law.
  • Services contracts: Performance of activities or delivery of results other than works or supplies, including many professional, technical and operational services.

Mixed contracts may combine elements of two or more different categories when the legal conditions are met. The classification is important because it affects the procurement rules and the practical responsibilities of the supplier.

Legal Framework Under Ley 9/2017

The main legal reference for Spanish public procurement contract types is Ley 9/2017, de 8 de noviembre, de Contratos del Sector Público. It transposes relevant European Union procurement directives into Spanish law and establishes the rules for classifying, preparing, awarding and managing public-sector contracts.

The principal provisions on contract classification are:

  • Article 12: Classification of public-sector contracts.
  • Article 13: Works contracts.
  • Article 14: Works concession contracts.
  • Article 15: Services concession contracts.
  • Article 16: Supply contracts.
  • Article 17: Services contracts.
  • Article 18: Mixed contracts.

Other provisions of the LCSP govern issues such as contract value, procurement procedures, technical specifications, selection criteria, contract duration, award criteria, performance and modifications. Suppliers should therefore read the contract classification together with the relevant tender documents and applicable legal provisions.

It is also important to distinguish between administrative contracts and private contracts within the public sector. The applicable legal regime may depend on the contracting entity and the subject of the agreement. The fact that a public-sector organisation is involved does not mean that every agreement automatically has the same legal classification.

Works Contracts in Spain

A works contract concerns the execution of a construction or engineering project, either independently or together with the preparation of the project design. Article 13 of the LCSP also covers the execution, by any means, of a work that meets the requirements established by the contracting public-sector entity when it exercises decisive influence over the type or design of the work.

Works contracts can cover a wide range of public infrastructure and building projects, including:

  • Construction of public buildings, schools, hospitals and administrative facilities.
  • Roads, bridges, tunnels and transport infrastructure.
  • Water supply, drainage and wastewater infrastructure.
  • Public parks, urban development and civil engineering works.
  • Renovation, rehabilitation and structural improvement projects.
  • Electrical, mechanical and other building-related installation works.

The precise classification depends on the actual subject of the procurement. A contract involving the installation of equipment may be a supply contract or a works contract depending on the nature and scope of the main obligation.

What suppliers should consider

Construction companies and engineering contractors should review the technical project, scope of works, site conditions, delivery schedule, quality standards and acceptance requirements. They should also examine financial and technical solvency criteria, professional qualifications, insurance, health and safety obligations and any required contractor classification.

Pricing should account for materials, labour, machinery, transport, subcontractors, site management, permits where relevant and project risks. A works contract may involve complex delivery obligations and significant financial exposure if the project is delayed or the scope is misunderstood.

Suppliers should review the PCAP and PPT, drawings, technical specifications, bills of quantities and other project documents where applicable. They should also identify the procedure for requesting clarification before the tender deadline.

Works Concession Contracts in Spain

A works concession is different from an ordinary works contract. Under Article 14 of the LCSP, the contracting authority entrusts the execution of works, which may include their design, to a concessionaire. The consideration includes the right to exploit the completed works, or that right together with a price.

The defining feature is the transfer of operational risk to the concessionaire. The company must be exposed to the possibility that it may not recover its investment or operating costs under normal operating conditions because actual demand or supply conditions affect the economic result.

Potential examples can include:

  • Construction and operation of certain transport infrastructure.
  • Public parking facilities developed and operated under a concession.
  • Infrastructure projects where the concessionaire receives revenue from users.
  • Construction and operation of facilities under a long-term concession arrangement.

The exact classification depends on the project structure, the consideration and the allocation of operational risk. A construction project does not become a works concession merely because it is large or long-term.

What suppliers should consider

Companies interested in works concessions need to assess both construction and long-term operating responsibilities. They should analyse investment requirements, financing, demand forecasts, user charges, maintenance costs, operating expenses, revenue assumptions and contractual risk allocation.

The commercial model can be substantially different from a conventional construction contract. Instead of receiving only a payment for completing the works, the concessionaire may depend on the revenue generated by operating the infrastructure. A detailed financial model and risk assessment are therefore essential before bidding.

Services Concession Contracts in Spain

A services concession is an arrangement under which a contracting authority entrusts the management or provision of a service for which it is responsible to a concessionaire. Under Article 15 of the LCSP, the consideration includes the right to exploit the service, or that right together with a price.

The right to exploit the service must involve the transfer of operational risk to the concessionaire. This risk is a central distinction between a services concession and an ordinary services contract.

Examples may include:

  • Operation of certain public transport services.
  • Management of public facilities and leisure services.
  • Operation of parking services.
  • Management of certain public catering or facility services.
  • Other public services where the concession structure and operational risk requirements are satisfied.

The classification must be assessed from the actual contractual arrangements. A company providing cleaning, consultancy or routine maintenance for a public authority will generally be performing a services contract rather than a services concession if it is simply paid a contract price and does not assume the relevant operational risk.

What suppliers should consider

Potential concessionaires should examine the service standards, user demand, operating model, revenue mechanism, staffing, maintenance, investment obligations and risk allocation. They should also consider how performance will be monitored and what happens if service levels are not achieved.

Because a concession can involve operating a service over an extended period, businesses should assess the sustainability of the financial model rather than focus only on the initial tender price.

Supply Contracts in Spain

A supply contract primarily concerns the acquisition or rental of movable goods and products. Article 16 of the LCSP covers the acquisition, financial leasing or ordinary leasing of movable property, with or without an option to purchase.

Supply contracts are common across public authorities because government organisations regularly purchase equipment, materials, technology and other products required for their operations.

Examples include:

  • Office furniture, stationery and general equipment.
  • Computers, servers, networking equipment and telecommunications systems.
  • Medical devices, hospital equipment and laboratory supplies.
  • Vehicles, machinery and technical equipment.
  • Energy products and other covered supplies.
  • Products manufactured to specifications established by the contracting authority.

The LCSP also treats certain recurring deliveries at unit prices as supplies, even when the total quantity is not precisely defined at the time of contracting because deliveries depend on the purchaser’s requirements.

Special rules apply to some technology and software arrangements. For example, the acquisition or leasing of certain computer programs and equipment may be treated as a supply, whereas the acquisition of custom-developed computer programs is treated as a services contract under the relevant provision of Article 16.

What suppliers should consider

Manufacturers, distributors and equipment suppliers should examine product specifications, technical standards, delivery quantities, packaging, warranty periods, installation requirements, after-sales support and replacement obligations.

They should also check whether the tender allows equivalent products and how the authority will assess technical compliance. Where a product must meet a particular certification or standard, the supplier should provide the evidence requested in the tender documents.

For recurring or unit-price supplies, businesses should evaluate their ability to maintain stock, manage delivery schedules and meet fluctuating demand. The estimated contract value should not automatically be treated as a guaranteed purchase quantity.

Services Contracts in Spain

A services contract covers activities or obligations to perform work that do not fall within the definition of a works or supply contract. Article 17 of the LCSP includes services involving the performance of an activity or the achievement of a result other than a work or supply. It can also cover services delivered successively at unit prices.

Services contracts are used throughout the public sector and can involve professional expertise, technical support, operational assistance and recurring activities.

Common examples include:

  • IT consulting, software support and technology services.
  • Management consulting and professional advisory services.
  • Cleaning, security and facility management.
  • Training, research and technical assistance.
  • Engineering and architectural consultancy.
  • Translation, communication and design services.
  • Maintenance, inspection and other operational services.

Services contracts cannot be used for services that involve the exercise of powers inherent to public authorities, as stated in Article 17.

What suppliers should consider

Service providers should examine the required activities, deliverables, service levels, staffing, qualifications, experience, response times and performance indicators. The authority may assess the quality of the proposed methodology, the expertise of key personnel and the organisation of service delivery.

Pricing should reflect staff costs, working hours, specialist resources, travel, equipment, insurance, management and other operational expenses. Where services are provided continuously or at unit prices, the supplier should also assess how demand may vary during the contract.

Mixed Public Procurement Contracts

A mixed contract combines elements belonging to two or more different contract types. Article 18 of the LCSP governs these arrangements. Article 34.2 also requires the different services or obligations to be directly linked and complementary, with a relationship that justifies treating them as one functional unit to meet a specific need or achieve the contracting authority’s institutional purpose.

A mixed contract may combine works, supplies and services. Depending on the structure, it may also involve procurement and concession elements, subject to the applicable legal rules.

Examples may include:

  • Supply and installation of specialist equipment as part of a larger works project.
  • Supply of IT hardware combined with installation, configuration and support services.
  • Construction works combined with maintenance or operational services.
  • Supply and installation of technical systems together with ongoing service obligations.

The authority must determine the principal subject and the applicable rules for preparing and awarding the mixed contract. Article 18 contains specific rules for different combinations. For combinations of works, supplies and services, the main subject is generally determined by the principal performance. In certain combinations, including services and supplies, the law uses the higher estimated value to determine the main subject. Mixed contracts involving concessions are subject to their own statutory classification rules.

What suppliers should consider

Businesses should not assume that a mixed contract can be treated as a simple supply or services opportunity. They must review the full scope and identify every component for which they are responsible.

A company may need to demonstrate capability across several disciplines or work with specialist partners and subcontractors where permitted. It should also examine which requirements are mandatory, how the components will be evaluated and whether the contract creates combined delivery, maintenance or performance obligations.

Comparison of Spain Public Procurement Contract Types

The following table summarises the main differences between the principal contract classifications under the LCSP.

Contract typeMain subjectTypical examplesKey supplier consideration
WorksExecution of construction or engineering worksRoads, buildings, bridges and infrastructureProject delivery, technical capability, site and construction risks
Works concessionExecution of works with a right to exploit them and transfer of operational riskInfrastructure developed and operated under a concessionInvestment, financing, operating revenue and demand risk
Services concessionManagement or provision of a service with a right to exploit it and transfer of operational riskPublic facilities, transport or other concession-based servicesOperating model, service performance and revenue risk
SupplyAcquisition or rental of movable goods and covered productsEquipment, vehicles, furniture and technologyProduct compliance, quantities, delivery and warranties
ServicesActivities or results other than works or suppliesConsultancy, cleaning, IT support and maintenancePersonnel, expertise, methodology and service levels
MixedCombination of different contract performances permitted by lawEquipment supply with installation and supportCombined scope, technical coordination and applicable legal regime

The classification should always be checked against the official tender documents. Similar commercial activities can be classified differently depending on the actual obligations, the main subject and the allocation of operational risk.

Contract Type vs Procurement Procedure

Contract type and procurement procedure are two different concepts. Contract type describes what the authority is purchasing or arranging. Procurement procedure describes how the authority selects the supplier and awards the contract.

For example, a public authority may procure construction works through an open procedure. It may also use an open procedure to purchase IT equipment or appoint a service provider. The contract type does not, by itself, identify the procurement procedure.

Common procedures under Spanish procurement law include:

  • Open procedure.
  • Restricted procedure.
  • Simplified open procedure and super-simplified open procedure, where statutory conditions are met.
  • Negotiated procedures in the legally permitted circumstances.
  • Competitive dialogue.
  • Innovation partnership.

Suppliers should identify both the contract type and the procurement procedure when reviewing a notice. They should then check the selection criteria, award criteria, submission method and deadline.

How Contract Classification Affects Suppliers

Contract classification has practical consequences for companies preparing to participate in Spanish public procurement. It helps suppliers understand the nature of the obligation and the evidence that may be required to demonstrate their ability to perform it.

Business suitability: A supplier should focus on contract types that match its products, services, construction capabilities or operating model.

Technical qualifications: Works contracts may require construction experience, technical personnel and equipment. Services contracts may focus on staff qualifications and methodology. Supply contracts may require product specifications, certifications and delivery capability.

Financial exposure: Concessions can involve investment and operational risk, while conventional supplies and services may use payment structures based on delivery, performance or unit prices.

Pricing: Each contract type has a different cost structure. Construction bids need to consider site and project costs. Supply bids need to account for goods, logistics and warranties. Services bids must reflect personnel and operational costs. Concession bids require a broader financial and demand-risk assessment.

Contract duration: Duration and performance obligations depend on the contract type and applicable statutory provisions. Suppliers should not assume that every contract has the same term or extension conditions.

Partnerships and subcontracting: A complex works, concession or mixed contract may require specialist partners. Suppliers should review whether joint participation, subcontracting or reliance on the capacity of other entities is permitted and how it must be documented.

Eligibility and Qualification Requirements

Eligibility requirements are determined by the applicable law and the specific tender documents. A company may need to demonstrate legal capacity, absence of applicable exclusion grounds, financial and economic solvency and technical or professional capability.

Requirements vary according to the contract’s subject, value and complexity. A construction procurement may require evidence of completed works, specialist staff, machinery or contractor classification where applicable. A supply procurement may focus on product compliance, distribution capacity and delivery arrangements. A service procurement may require professional qualifications, relevant experience and a suitable delivery team.

Concession contracts may require particular financial and operational capabilities because the supplier can be responsible for financing, operating or maintaining an asset or service and may bear operational risk.

Suppliers should check the PCAP for administrative and qualification conditions and the PPT for technical requirements. They should also review whether ROLECE registration, DEUC/ESPD declarations or other evidence is required or accepted for the particular procurement.

Contract Value and Publication Requirements

Contract classification can affect which financial thresholds and publication rules apply. Under the LCSP and relevant European procurement rules, certain contracts become subject to harmonised regulation when their estimated value reaches the applicable threshold, taking account of the contracting authority and contract type.

Works contracts and works or services concessions have different threshold treatment from supplies and services contracts. Special thresholds and rules may also apply to certain social, health, educational, cultural and other services.

Thresholds can change over time and depend on the authority and the applicable procurement regime. Suppliers should therefore avoid relying on old threshold tables or applying one figure to every Spanish public tender.

Before publication or bidding, check the current consolidated LCSP, the applicable European threshold regulation and the contracting authority’s tender documents. The estimated contract value should also be distinguished from the tender’s budget, the amount payable and the revenue a supplier may actually receive.

How to Identify the Contract Type in a Tender Notice

Spanish procurement notices normally identify the contract type or describe the procurement subject in a way that allows suppliers to understand its classification. However, a supplier should not rely only on the headline or a short description.

When reviewing a notice, check:

  • Contract type: Identify whether it is classified as works, works concession, services concession, supplies, services or mixed.
  • Subject matter: Read the description of the main requirement and the authority’s intended outcome.
  • CPV codes: Review the Common Procurement Vocabulary codes used to classify the procurement.
  • Estimated value: Understand the size and financial scope of the opportunity.
  • Lots: Check whether the procurement is divided into separate product, service or geographic lots.
  • Contract duration: Identify the expected performance period and any permitted extensions.
  • Technical documents: Read the PPT and supporting specifications to understand the actual deliverables.
  • Administrative documents: Review the PCAP for legal conditions, eligibility, award criteria and performance obligations.

If the classification appears unclear, suppliers should review the full procurement documents and use the official clarification process within the permitted period. Do not make a bid decision solely from a search-result snippet.

How to Search Spain Tenders by Contract Type

Businesses can improve tender discovery by combining contract-type searches with sector, CPV, authority, location and keyword filters. This makes it easier to identify opportunities that match the company’s actual commercial activity.

Works opportunities: Search for construction, civil engineering, building renovation, road infrastructure and related CPV classifications.

Works concessions: Look for infrastructure development and operation opportunities, while checking whether the procurement transfers operational risk to the concessionaire.

Services concessions: Search for public service management and operation opportunities, and assess the revenue and risk arrangements in the tender documents.

Supply opportunities: Search by product categories such as medical equipment, vehicles, IT hardware, furniture and industrial supplies.

Services opportunities: Search by professional and operational services such as IT, consulting, cleaning, maintenance, training and technical assistance.

Use SpainTenders tender listings to explore available public procurement opportunities. Combine the search with the sector directory and contracting authority directory to focus on relevant industries and buyers.

Businesses should also review SpainTenders contract awards to understand past procurement activity and identify authorities that have awarded similar contracts. Historical awards can provide market intelligence, but they do not guarantee future opportunities or outcomes.

Common Mistakes Suppliers Should Avoid

  • Confusing contract type with procedure: Works, supplies and services describe the subject of a contract, while open and restricted procedures describe how suppliers are selected.
  • Assuming every construction-related tender is a works contract: Installation, maintenance and equipment-related activities may have different classifications depending on the main obligation.
  • Ignoring concession risk: A concession can transfer operational risk to the supplier, which changes the commercial assessment.
  • Misunderstanding software procurement: Certain software acquisitions are treated as supplies, while custom-developed software is treated as a service under the LCSP provisions.
  • Overlooking mixed-contract obligations: Suppliers should review every component of a combined procurement and understand the main subject.
  • Using outdated thresholds: Thresholds and publication requirements should be checked against the current rules.
  • Reading only the tender title: The PCAP, PPT and supporting documents provide the detail needed to assess the opportunity.
  • Underestimating delivery risks: The cost and performance obligations vary significantly between construction, supply, services and concession contracts.

Practical Checklist for Suppliers

Before bidding for a Spanish public contract, businesses should confirm the following:

  • The legal contract type has been identified correctly.
  • The subject matter and scope match the company’s capabilities.
  • The procurement procedure and submission requirements are understood.
  • The relevant CPV codes and lots have been reviewed.
  • The estimated value and contract duration have been assessed.
  • All technical and administrative documents have been reviewed.
  • The company meets the eligibility and solvency requirements.
  • Any concession-related operational risk has been evaluated.
  • All components of a mixed contract have been assessed.
  • The price covers the full delivery and performance obligations.
  • The electronic submission method and deadline have been verified.
  • The official notice and latest tender documents have been checked before submission.

How SpainTenders Can Help

Understanding contract types is an important part of identifying suitable public procurement opportunities. SpainTenders can support suppliers by helping them discover tender notices, review published contract awards and research public-sector buyers across different industries.

Businesses can explore SpainTenders public tender listings, review contract award notices, identify relevant industries through the sector directory and research buyers through the contracting authority directory.

Suppliers can register with SpainTenders to explore available services and log in to access their account. Businesses that need assistance can visit the SpainTenders contact page.

SpainTenders is a tender discovery and procurement research resource. It does not replace the contracting authority’s official notice, legal documents or electronic submission platform. Suppliers should always verify contract classification, eligibility, deadlines and obligations against the original procurement documents before submitting a bid.

Conclusion

Spain’s public procurement system recognises several principal contract types, each designed for a different purchasing or operating requirement. Works contracts cover construction and engineering activities, supply contracts cover movable goods and products, and services contracts cover activities and results other than works or supplies. Works and services concessions introduce the right to exploit an asset or service together with the transfer of operational risk. Mixed contracts combine different types of performance when the statutory conditions are satisfied.

For suppliers, understanding these distinctions is essential before deciding whether to participate in a tender. Contract type can affect qualification requirements, pricing, technical evidence, contract duration, financial exposure and delivery obligations.

Businesses should review the legal classification, CPV codes, PCAP, PPT, estimated value and award criteria before preparing an offer. By combining accurate contract-type identification with targeted tender searches, companies can focus their resources on Spanish public procurement opportunities that genuinely match their capabilities.

Frequently Asked Questions (FAQs)

The main types under the LCSP are works contracts, works concessions, services concessions, supply contracts and services contracts. Mixed contracts can combine different types of performance when the statutory conditions are met.
Ley 9/2017, de Contratos del Sector Público (LCSP), defines the main contract types in Articles 12–18.
A works contract concerns the execution of construction or engineering works, either independently or together with project preparation, as defined under Article 13 of the LCSP.
A works concession entrusts the execution of works to a concessionaire in return for the right to exploit the completed works, potentially together with a price. It involves the transfer of operational risk to the concessionaire.
A services concession entrusts the management or provision of a public service to a concessionaire. The consideration includes the right to exploit the service, potentially together with a price, and operational risk is transferred to the concessionaire.
In an ordinary services contract, the supplier performs the required service in return for the contractual payment. In a services concession, the right to exploit the service forms part of the consideration and operational risk is transferred to the concessionaire.
A supply contract generally covers the acquisition or rental of movable goods and products. It can include equipment, vehicles, furniture, medical devices and certain IT products.
It depends on the arrangement. Certain software acquisitions and licensing arrangements are treated as supplies under Article 16, while the acquisition of custom-developed computer programs is treated as a services contract under the LCSP.
A services contract covers activities or results other than works or supplies. Examples can include consulting, cleaning, IT support, training, maintenance and technical assistance.
A mixed contract combines performances belonging to different contract types. Under the LCSP, the combined elements must satisfy the legal conditions for being treated as a single functional procurement.
Yes. For example, a procurement may combine the supply of IT equipment with installation, configuration and support services, provided the legal conditions for a mixed contract are met.
A works contract primarily concerns executing the required works for the agreed consideration. A works concession includes the right to exploit the completed works and involves the transfer of operational risk to the concessionaire.
Operational risk means that the concessionaire is exposed to uncertainty about recovering its investment or operating costs under normal operating conditions. Demand or supply conditions can affect the financial outcome.
No. Contract type identifies the subject of the procurement, while procedure describes how the authority selects the supplier. An open procedure, for example, can be used for different contract types.
Contract type identifies the legal category of the procurement. A CPV code classifies the subject matter using the Common Procurement Vocabulary, helping authorities and suppliers describe and search for opportunities.
They can. Works, supplies, services and concessions may require different technical experience, professional qualifications, financial solvency, equipment, licences or other evidence depending on the procurement documents.
No. Applicable thresholds can differ by contract type and contracting authority. They can also change over time, so suppliers should check the current legal rules before relying on a threshold figure.
Review the contract type shown in the notice, the subject description, CPV codes, administrative specifications (PCAP) and technical specifications (PPT). The complete documents provide the basis for understanding the actual scope.
Foreign companies may participate if they meet the applicable eligibility, qualification, professional and submission requirements. The precise evidence required depends on the contract and the tender documents.
SpainTenders supports procurement research through tender listings, contract awards, sector information and contracting authority information. Suppliers should verify the original official notice and documents before bidding.
SpainTenders Features
SpainTenders Features

Fresh and verified Tenders from Spain. Find, search and filter Tenders/Call for bids/RFIs/RFPs/RFQs/Auctions published by the government, public sector undertakings (PSUs) and private entities.

  • 1,000+ Tenders
  • Verified Tenders Only
  • New Tenders Every Day
  • Tenders Result Data
  • Archive & Historical Tenders Access
  • Consultants for RFI/RFP/RFQ
  • Tender Notifications & Alerts
  • Search, Sort, and Filter Tenders
  • Bidding Assistance & Consulting
  • Customer Support
  • Publish your Tenders
  • Export data to Excel
  • API for Tender Data
  • Tender Documents
Tender Experts
Get A Call From Tender Experts

Fill out the form below and you will receive a call from us within 24 hours.

Thank You for Contacting SpainTenders !!
Email Id is already exist !!
Captcha Image
Invalid Captcha !

Get FREE SAMPLE TENDERS from Spain in your email inbox.